Sunday, August 15, 2010

Kitchen progress




Been at it in the kitchen again today! Another step closer to actually finishing...
Put the door on the washing machine, the door on the 200mm pull out unit and made a false base and back for the gap between the W/M and pan drawer unit to convert it into usable space.
Still got to fit the plinths correctly (they're just resting in position for pictures), connect fridge & freezer doors to the unit doors, adjust all doors to make gaps uniform & level, and fit the soft closers. I think I'll end up rubbing the worktops back a bit and putting a few more coats of oil on them once the splashbacks are done. I'm not sure what to do there, originally thought of tiling but I'm now considering doing them in glass. I'll need to look into it... Still need to seal around hob, silicone along back edge of worktops, cut & fit shelf in sink unit, seal wall units and end panels to walls and ...... I'm sure I'll find something that needs doing!

2 comments:

  1. Cor, looks even better than last week, now all the doors are fitted!
    Hmmm, glass splashbacks??? Sounds like a good idea, apart from the cleaning LMAO!!!

    me xxx

    ReplyDelete
  2. Looks great Bill. Well done! Look forward to seeing it all come together on HUTH.

    J x

    ReplyDelete

Hi readers, please leave a note to say you dropped by and where you're from. Thanks & take care folks