Sunday, August 15, 2010
Bits
Well the film crew have been and filmed an unfinished project. I'm a bit gutted about that as I would much rather have shown them a completed job. But, looking back through all my photos I've done a huge amount of work in a relatively short space of time, especially considering that I've still had to go to work and was delayed by 11 weeks due to the window company's poor performance.
Anyway if I get this in the right order there should be pictures of...the toilet! Just to show it was cleaned of all it's dust for the cameras.
The new fuse board, meter tails and Earth. The electrics are now all complete. Every circuit is working and I am in possession of the certificates from the Spark. Literally from the meter onwards is all brand new to meet the 17th edition electrical regs. I believe the Spark will be notifying building control in due course too...
The bath is now in situ although it has to be taken out again as I need to run a load of pipes along the wall behind it before it gets fixed in it's final location. Hopefully towards the end of this coming week I'll find the time for that.
And finally the front door - now in black gloss with the new chrome furniture. Will need another coat but for now it looks much tidier than it did and it has a better resistance to the damp getting in.
Subscribe to:
Post Comments (Atom)
Thank goodness you cleaned that toilet, but I have photographic evidence of how bad it was LOL!
ReplyDeleteThought the front door would look too dark black, but as it's gloss it looks good especially with the chrome!
me xxx