Friday, March 25, 2011
Wetroom En-suite
The wetroom En-suite floor former is now fitted although waste not connected yet! Will do that, the basin waste and the new hole for the second toilet soil pipe all in one go when the core drilling equipment is out. Have spent three days tiling in there - just the grouting still to do which I'll get into next week once the tiles are fully cured.
Bathroom
Floors
Rads
Loft Insulation
The loft is now fully insulated at ceiling level between the joists with 100mm Recticel PIR board. This gives the same 'U' values as using 270mm fibreglass but means we can still use all of the loft for storage space. Hundreds of pounds worth of insulation and about 6/7 days of my time..... But should be worth it in the long run.
Thermaskirt (cont)
Here's a few more piccies of the Thermaskirt. It's now all fitted and up & running. Just the bottom strips and corner covers etc to be fitted once all the floor coverings are finished.
We are getting a little noise from it at the moment during the heating/cooling cycles. The folks up at Thermaskirt HQ have made a few suggestions that may well sort it out so we'll give it a go over the next few weeks!
Saturday, February 19, 2011
Progress
Still no pictures to upload - I'll do those soon...
We now have the loft completely insulated and the central area boarded out for storage. The decorative radiator in the kitchen and the heated towel rail in the bathroom are now fitted and connected to the heating circuit. The faulty Thermaskirt Thermovalve seat replaced and the Automatic Air Vent in the boiler cupboard moved so as it now works better. The heating system just needs it's final drain & flush then re-filling & dosing with inhibitor. The bathroom & kitchen now have the vinyl flooring fitted and the living room & bedroom now have carpet. All internal doors have had two coats of natural Oak varnish. New toilet (temporarily connected to drain) & basin installed in the bathroom. Old toilet removed and wetroom floor former down. Front door (internal side) & meter cupboards sanded & given first coat of oil based undercoat.
Bathroom extractor fan is in-adequate to prevent a build up of steam in the bathroom so we either upgrade it and the en-suite one or install a Mechanical ventilation & heat recovery system. We've got a system being quoted for at present and may well visit Ecobuild in March to investigate further.
We now have the loft completely insulated and the central area boarded out for storage. The decorative radiator in the kitchen and the heated towel rail in the bathroom are now fitted and connected to the heating circuit. The faulty Thermaskirt Thermovalve seat replaced and the Automatic Air Vent in the boiler cupboard moved so as it now works better. The heating system just needs it's final drain & flush then re-filling & dosing with inhibitor. The bathroom & kitchen now have the vinyl flooring fitted and the living room & bedroom now have carpet. All internal doors have had two coats of natural Oak varnish. New toilet (temporarily connected to drain) & basin installed in the bathroom. Old toilet removed and wetroom floor former down. Front door (internal side) & meter cupboards sanded & given first coat of oil based undercoat.
Bathroom extractor fan is in-adequate to prevent a build up of steam in the bathroom so we either upgrade it and the en-suite one or install a Mechanical ventilation & heat recovery system. We've got a system being quoted for at present and may well visit Ecobuild in March to investigate further.
Subscribe to:
Posts (Atom)